The hospital is built with the support of (Photo: VNA)(VNA) – The southern province of Binh Duong on July 18 put a 1,500-bed temporary hospital into operation as part of its efforts to cope with to the COVID-19 pandemic.
The hospital, one of
the two temporary hospitals built with support of Becamex Investment and Industrial
Development Corporation (Becamex IDC), is located on Hung Vuong street, Hoa Phu
ward, .
Medical staff ready to work at the hospital (Photo: VNA)Covering an area of
22,000 sq.m, the hospital is fully equipped to serve almost all medical operations.
General Director of Becamex
IDC Pham Ngoc Thuan said that the second temporary hospital will be set up at Becamex-invested Eastern International University.
The first temporary hospital has a capacity of 1,500 beds (Photo: VNA)With a capacity of
1,500 beds, the second hospital is expected to become operational right in August.
Binh Duong has recorded
2,175 infections in the current outbreak of . The pandemic is
developing complicated in the southern industrial hub, with the number of new
cases predicted to continue rising./.
Source: VietnamPlus
